For schools in 28 campuses (total construction area of 94.000 m2) in İzmir Province provided by the Ministry of Education(Buca, Konak, Karabağlar, Ödemiş, Bergama, Aliağa, Bayındır, Gaziemir, Kemalpaşa, Menemen, Torbalı, Bornova, Menderes, Urla), architectural, static, mechanical and electrical installation, fire evacuation, acoustic report, infrastructure, environmental arrangement projects, technical specifications and preparation of construction tender documents will be carried out by Alter.
In addition, Alter carries out ground surveys for 23 campuses; preparing data and geotechnical reports, reinforcement needs according to the land situation of each parcel, and preparation of shoring projects.