5 small dam planning report and 1 small dam Preliminary planning had been made in the scope of Project work. In the scope of Project, planning reports of Kula-Dutluca, Kula-Saraçlar, Kula-Yurtbaşı, Gördes-Karayağcı, Demirci-Durhasansmall dams and Selendi dam which are on the purpose of of irrigation. Geotechnical research, natural construction material survey and laboratory analysis, agricultural economy and expropriation study, land grading and drainage study, preparing of Project Introduction Folder which determines environmental effects, obtaining of EIA certificate had been carried out in planning studies.